Lead architecture
Facility design intent as an AI system — power, cooling, network, monitoring and operations coordinated into one validated design, with the OEM specifications and the engineer of record reconciled rather than assumed.
AI hardware has moved faster than the buildings meant to hold it. A single modern cabinet can draw what a street of houses draws, and it will throttle or trip within seconds of losing flow. We design for that reality, manage the build, commission it, run it with AIDA ECOS™ — and we supply the equipment that makes it live.
Most providers hand off at a boundary. We carry the design intent across all four, which is why the thing that gets built is the thing that was drawn.
Facility design intent as an AI system — power, cooling, network, monitoring and operations coordinated into one validated design, with the OEM specifications and the engineer of record reconciled rather than assumed.
Integrated schedule, risk register, change control and day‑to‑day site direction alongside the contractor of record — sequencing, quality and readiness, with inspection and acceptance on the owner's behalf.
Commissioning through integrated systems test, then steady‑state operation on {AIDA}: redundancy verified continuously, efficiency reported to billing standard, incidents escalated on a defined path.
Racks, power distribution, UPS and storage, chillers and CDUs, switchgear, structured cabling, network, cameras and access control — procured, delivered and installed. See the categories →
From the utility service to the cabinet manifold, every meaningful point is read, checked against its design envelope and recorded. That is what turns a Tier III claim into a Tier III demonstration — and what makes a billing‑grade efficiency figure defensible when a tenant asks how it was derived.
Synchronised training jobs swing facility demand in milliseconds. Utility service, generation, UPS topology and distribution all have to be engineered for that profile — and then verified continuously, because a design that was right on paper drifts in service.
High‑density air cooling and direct‑liquid cooling are different disciplines, and a credible facility can state honestly what it sustains in each.
Altitude is not a footnote. Cooling towers, pumps, fans and generators all derate with elevation. On high‑desert sites we design to the derated numbers from the first drawing, and we say so to the tenant.
Modern accelerated cabinets arrive heavy, hot and intolerant of improvisation. The building has to be ready for them physically, not just electrically.
Cameras that nobody watches are furniture. We integrate surveillance and access into the same operating picture as power and cooling, so a physical event escalates like any other incident.
Commissioning is where optimistic schedules meet physics. We plan it as real work with real duration, and we test the failure modes rather than the happy path.
Resiliency is claimed against the recognised classifications — Uptime Institute Tier III, TIA‑942 Rated‑3 and BICSI 002 Availability Class 3 — and demonstrated through concurrent maintainability, not asserted in a narrative. Thermal design follows ASHRAE TC 9.9 for mission‑critical facilities and the OEM specification where it is tighter. Electrical acceptance follows recognised field‑testing practice; fire detection and suppression follow the applicable NFPA codes. Commissioning runs Level 1 through Level 5, closing with an integrated systems test under load.
This is the part that surprises people: we execute the work, design the solution and support it after implementation — and we also sell the products and services that bring the facility to live status. One accountable party from drawing to energisation.
Switchgear and transformers, UPS and lithium‑ion storage, energy storage for transient smoothing, generation, busway and metered rack power distribution.
Chillers and heat rejection, facility CDUs, pumps and hydronics, containment and rear‑door heat exchangers, coolant chemistry programmes and leak detection.
Accelerated compute platforms, cabinets, cages and secure staging, and the in‑rack distribution that feeds them.
Structured cabling and trunks, management‑plane switching, meet‑me room build and carrier coordination.
Video management, camera estate, access control, fire detection and suppression coordination.
Commissioning agents, water treatment programmes, structural and floor‑loading assessment, environmental and air permitting support, and 24/7 remote hands.
We stay vendor‑independent. We hold preferred and alternate selections in every category, chosen for open telemetry, lead‑time realism and regional support — and we will recommend the option that serves the owner, including one we do not supply. Indicative pricing is presented as advisory ranges from the tenant's perspective until the design decisions are actually made.
A facility is judged on evidence: that it is concurrently maintainable, that efficiency is measured the way the contract says, that an incident was detected and escalated. ECOS produces that evidence continuously instead of assembling it before an audit.
An ERP programme with a date that cannot move. A facility that has to energise on schedule. An estate that needs to run itself more accurately than it does today. Start there — we will tell you honestly what it takes.